{"id":4823,"date":"2019-07-04T23:38:57","date_gmt":"2019-07-04T21:38:57","guid":{"rendered":"http:\/\/www.cyberdyne.it\/?post_type=case_studies&#038;p=4823"},"modified":"2021-10-13T18:54:15","modified_gmt":"2021-10-13T16:54:15","slug":"automotive-industry","status":"publish","type":"case-study","link":"https:\/\/www.cyberdyne.it\/en\/case-study\/automotive-industry\/","title":{"rendered":"Automotive Industry"},"content":{"rendered":"<p>[vc_section][vc_row css=&#8221;.vc_custom_1562149877897{padding-top: 40px !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_gallery interval=&#8221;3&#8243; images=&#8221;4824&#8243; img_size=&#8221;670X779&#8243;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text]<\/p>\n<h5><span style=\"color: #0a4f70;\"><i class=\"fa fa-bullseye \" ><\/i> <strong>CHALLENGE<\/strong><\/span><\/h5>\n<p>A multinational company specialized in the supply of high technology products and systems for the automotive industry had a quantity of backlogs to optimize. The main objective was therefore to reduce the volume of outstanding orders, so as to:<\/p>\n<ul>\n<li>increase revenues at the same production capacity;<\/li>\n<li>increase cost efficiency;<\/li>\n<li>have an effective stock inventory plan, reducing the fixed capital.<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_column_text]<\/p>\n<h5><span style=\"color: #0a4f70;\"><i class=\"fa fa-lightbulb-o \" ><\/i> <strong>SOLUTION<\/strong><\/span><\/h5>\n<ul>\n<li>Analysis of the plant and workforce rotation<\/li>\n<li>Order rationalization<\/li>\n<li>Application of new planning constraints on a single line and evaluation of the result to be applied to the process<\/li>\n<li>Production plan optimization<\/li>\n<li>Scheduling resizing<\/li>\n<\/ul>\n<p>[\/vc_column_text][vc_column_text]<\/p>\n<h5><span style=\"color: #0a4f70;\"><i class=\"fa fa-circle-o-notch \" ><\/i> <strong>RESULTS<\/strong><\/span><\/h5>\n<ul>\n<li>Reduction of non-fulfilled orders with lost revenue up by + 8% compared to the standard plan, not optimized with Cyber \u200b\u200bDyne AI technologies.<\/li>\n<li>Reduction of general machine and line setup times, managing the availability of technical staff.<\/li>\n<li>60% reduction of in-stock items.<\/li>\n<\/ul>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_empty_space height=&#8221;70px&#8221;][\/vc_column][\/vc_row][\/vc_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_section][vc_row css=&#8221;.vc_custom_1562149877897{padding-top: 40px !important;}&#8221;][vc_column width=&#8221;1\/2&#8243;][vc_gallery interval=&#8221;3&#8243; images=&#8221;4824&#8243; img_size=&#8221;670X779&#8243;][\/vc_column][vc_column width=&#8221;1\/2&#8243;][vc_column_text] CHALLENGE A multinational company specialized in the supply of high technology products and systems for the automotive industry had a quantity of backlogs to optimize. The main objective was therefore to reduce the volume of outstanding orders, so as to: increase revenues at the same production &#8230; <a title=\"Automotive Industry\" class=\"read-more\" href=\"https:\/\/www.cyberdyne.it\/en\/case-study\/automotive-industry\/\" aria-label=\"More on Automotive Industry\">Read more<\/a><\/p>\n","protected":false},"featured_media":4824,"template":"","format":"standard","meta":[],"categories":[43,47],"acf":[],"_links":{"self":[{"href":"https:\/\/www.cyberdyne.it\/en\/wp-json\/wp\/v2\/case-study\/4823\/"}],"collection":[{"href":"https:\/\/www.cyberdyne.it\/en\/wp-json\/wp\/v2\/case-study\/"}],"about":[{"href":"https:\/\/www.cyberdyne.it\/en\/wp-json\/wp\/v2\/types\/case-study\/"}],"version-history":[{"count":0,"href":"https:\/\/www.cyberdyne.it\/en\/wp-json\/wp\/v2\/case-study\/4823\/revisions\/"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cyberdyne.it\/en\/wp-json\/wp\/v2\/media\/4824\/"}],"wp:attachment":[{"href":"https:\/\/www.cyberdyne.it\/en\/wp-json\/wp\/v2\/media\/?parent=4823"}],"wp:term":[{"taxonomy":"categories","embeddable":true,"href":"https:\/\/www.cyberdyne.it\/en\/wp-json\/wp\/v2\/categories\/?post=4823"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}