[vc_section][vc_row css=”.vc_custom_1562149877897{padding-top: 40px !important;}”][vc_column width=”1/2″][vc_gallery interval=”3″ images=”4824″ img_size=”670X779″][/vc_column][vc_column width=”1/2″][vc_column_text]
CHALLENGE
A multinational company specialized in the supply of high technology products and systems for the automotive industry had a quantity of backlogs to optimize. The main objective was therefore to reduce the volume of outstanding orders, so as to:
- increase revenues at the same production capacity;
 - increase cost efficiency;
 - have an effective stock inventory plan, reducing the fixed capital.
 
[/vc_column_text][vc_column_text]
SOLUTION
- Analysis of the plant and workforce rotation
 - Order rationalization
 - Application of new planning constraints on a single line and evaluation of the result to be applied to the process
 - Production plan optimization
 - Scheduling resizing
 
[/vc_column_text][vc_column_text]
RESULTS
- Reduction of non-fulfilled orders with lost revenue up by + 8% compared to the standard plan, not optimized with Cyber Dyne AI technologies.
 - Reduction of general machine and line setup times, managing the availability of technical staff.
 - 60% reduction of in-stock items.
 
[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space height=”70px”][/vc_column][/vc_row][/vc_section]